Pictorial illustrations

Common applications of helical assemblies are highlighted in the "pdf" documents below:

Commercial Applications (pdf)

Download

Facilities and Pipeline (pdf)

Download

Oilfield Anchors (pdf)

Download

Residential & Swimming Pools (pdf)

Download
image1
image2
image3

Helical Anchor and Pile Services

Guy Line Anchors

image4

  • Work Over Rigs & Coil Tubing Units 
  • Temporary and Permanent Installation
  • In-stock Single, Double and Triple Helix Anchors, Extensions and Terminators
  • Experienced in Flood Zone Conditions: Typical Permanent Installation ranges from 10 to 50 Anchors with Extensions and Terminators

High-pressure Line Anchors

image5

  • Temporary Anchors for above-ground high pressure lines, utilities and flowback operations
  • Typical installations range from 10 to 50 anchors and caps, depending on number of wells and client Specifications)
  • Standard Installation includes Anchors at every high pressure joint and every other low pressure joint

Anchor Pull Testing

image6

  •  Crews are equipped on each project to Pull Test and certify Anchors for up to 30,000 lbs of strength
  • Testing Equipment is calibrated annually to ensure our clients receive valid test results

Residential Foundations

image7

  • Typical installations range from 30 to 70 helical piles, depending on footprint, soils conditions and flood zone designations 

Swimming Pool Foundations

image8

  • Depending on shape and size of the pool, the typical quantity of helical piles varies between 10 and 20. 
  • Advantages include cost savings, expedited Schedule, and ability to immediately cover the work without cure time.

Retaining Wall Tie-Backs

image9

  • Depending on shape and size of the pool, the expected quantity of helical piles may be between 10 and 20. 
  • Advantages include cost savings, expedited Schedule, and ability to immediately cover the work without cure time.

Commercial Construction

image10

  • Whether for temporary utilities or permanent construction/foundations, helical earth anchors can be installed without delay to Project Schedules 
  • Helical piles provide greater confidence in the stability of projects as we have torque data for each pile installed.

Scheduled Services

image11

  • Scheduled Pull Testing Services are available for bi-annual anchor testing to satisfy select clients' safety programs and provide documentation for compliance 

image12

Area of Operations

Primary and Secondary Service Areas

While our Primary Service Area lies within a 250 mile radius of Houston, TX, with sufficient advance notice, we are able to accommodate client requests beyond this perimeter into the Secondary Service Area as pictured. 


Our Secondary Service Areas are determined on a case-by-case basis with consideration of crew availability within the schedule constraints of our clients. The Secondary Service Area includes West Texas, New Mexico, Oklahoma, Arkansas and Louisiana. 


Feel free to contact us to discuss dispatch and crew availability for your project. We will do anything within our ability to accommodate your needs. 

Request Service